Assignment Tracker Template for Google Sheets: Build It in Five Steps
Assignment tracker Google Sheets layout for students and parents: nine columns, checkboxes and due-soon colors, with a worked example and five steps.
By All-in-One Task Tracker by Cosmo Suite · Editorial policy
Published · 9 min read
A student's deadlines can sit in several places, such as a school portal, paper planner or group chat. A single Google Sheet can put those dates and their status in one list for a student or parent.
A Google Sheets assignment tracker is a list with one row per assignment and its due date. Add a checkbox and days-left count, then use a rule to color overdue and near-due rows. Build the layout in five steps, then make a copy for your own use.
There is no file to download; the layout below is for your own Sheet. Use our assignment tracker guide for grade weights and study hours. If coursework is one part of a longer task list, the All-in-One Task Tracker (by Cosmo Suite: one Excel and Google Sheets file, 11 tabs, $9 once) is one option; see a spreadsheet for work and home tasks.
Assignment Tracker in Google Sheets at a Glance
This nine-column layout starts with Assignment, Due date and Done. Add the other six fields when they help you sort or filter a longer list. The table pairs each suggested column with a Google Sheets feature that can support it; only the first three fields are needed to start.
| Column | What goes in | Google Sheets feature | Why it is there |
|---|---|---|---|
| A: Done | A tick box | Insert, then Checkbox | Strikes the row through and switches off its color |
| B: Assignment | A short name | Plain text | The thing to do |
| C: Course | The subject | Plain text or dropdown | Lets a filter view show one course |
| D: Type | Homework, Quiz, Project, Essay | Dropdown | Keeps the labels consistent |
| E: Due date | A date | Date cell | The number every other column reads |
| F: Days left | =IF(E2="","",E2-TODAY()) |
TODAY function | A countdown per row |
| G: Status | Not started, In progress, Submitted | Dropdown | Where the work stands |
| H: Priority | High, Medium, Low | Dropdown | A tie-breaker, not the order |
| I: Notes | Free text | Plain text | Rubric, partner, page range |
We chose the column set, status names and formula guard for this layout. Google documents the controls; the field choices remain ours. A parent can start with Assignment, Due date and Done, then add the other fields when useful. Google's Help pages document the checkbox, dropdown, conditional-formatting and filter-view controls used below: checkboxes, dropdowns, conditional formatting and filter views.
![]()
The December Assignment List, Worked Through
This worked example shows how one assignment tracker sorts work across a short December stretch. Its seven fictional rows use course, assignment, due date and status columns; the days-left formula makes an overdue item, two close dates and later work visible at a glance.
The courses, dates and rows are made up for this post and are not from any school or real student.
Seven rows, three weeks before winter break, show what the layout does on a Monday. We set the example's today to Monday, Dec 7, 2026 and use a three-day window. One row is done, one is overdue, two are amber and the later rows stay plain.
| Done | Assignment | Course | Due | Days left | Status |
|---|---|---|---|---|---|
| Yes | Algebra worksheet 6 | Math | Mon, Dec 7 | 0 | Submitted |
| No | Reading log pages | English | Fri, Dec 4 | -3 | In progress |
| No | Vocabulary quiz | Spanish | Wed, Dec 9 | 2 | Not started |
| No | Lab write-up | Science | Thu, Dec 10 | 3 | In progress |
| No | Book response | English | Fri, Dec 11 | 4 | Not started |
| No | Map project | Social Studies | Mon, Dec 14 | 7 | Not started |
| No | Unit review sheet | Science | Fri, Dec 18 | 11 | Not started |
Days left is the due date minus 7 December. The negative number marks the overdue reading log, so it turns red. The Spanish quiz (2 days) and lab write-up (3 days) are amber. The book response is 4 days out, so it has no color yet. The ticked algebra worksheet is struck through even though it is due today.
A saved filter view called "Due this week" would show five rows here: every unticked row with 7 or fewer days left. The view filters by date and tick, not by importance, so decide the order yourself rather than leaning on a Priority label.
![]()
Step 1: Set Up the Columns and the Checkbox
Type the nine headers in row 1, then put checkboxes in column A. Select the cells, click Insert, then Checkbox. Google also lets you set values for ticked and unticked boxes, such as Yes and No, through Data validation; we use Yes to mark a completed row. The unticked value is optional in Google's instructions.
- Type the headers from the glance table in row 1.
- Select A2 down to the last row you want, then click Insert, then Checkbox, as described on Google's checkbox page.
- With those cells still selected, click Data, then Data validation.
- Choose Checkbox next to "Criteria" and click Use custom cell values.
- Enter Yes next to "Ticked" and No next to "Unticked", then click Save. Google marks the unticked value as optional. We set both values so the rules below can check whether a row is marked Yes.
Step 2: Limit Type, Status and Priority to a Dropdown
Turn Type, Status and Priority into dropdowns so every row uses the same words. Select the cells, create a dropdown from a list, and Google rejects anything that does not match by default. Choose Show a warning under Advanced options if you want to allow other entries.
Select the Type cells, click Insert, then Dropdown, and enter each value with Add another item, as Google's dropdown page explains. Click Done. Repeat for Status and Priority.
We suggest these lists:
- Type: Homework, Quiz, Project, Essay
- Status: Not started, In progress, Submitted
- Priority: High, Medium, Low
"Submitted" as a final step is our suggestion. Consistent words matter later, because filter views and color rules only work when every row spells a value the same way.
Step 3: Count Down to the Due Date
Add a Days left column that subtracts today from the due date. In F2, enter the formula that returns the number of days between today and the date in column E, then format the column as a number. Negative results mean overdue and zero means due today.
Use =IF(E2="","",E2-TODAY()). The IF guard leaves the cell empty when no date has been typed, so blank rows stay quiet. That guard is our layout choice. Fill the formula down the column.
When several close dates stack up in the same days, a count alone will not solve it. Our guide to meeting deadlines when several tasks are due at once covers what to do next.
Step 4: Highlight What Is Due Soon
Use three conditional formatting rules with a custom formula so a whole row changes color. Select A2:I, click Format, then Conditional formatting, and choose Custom formula is. Put a dollar sign before the column letter so each row follows its own checkbox and due date.
Google's conditional formatting page lists the steps: select the cells, click Format, then Conditional formatting, choose Custom formula is, enter the formula under "Value or formula" and click Done. It also advises dollar signs "so that the formatting is applied using absolute references", and shows =$B1="Yes" for a whole row.
Apply the rules to A2:I. Add all three, then check the side panel: Done must be first, Overdue second and Due soon third. If the order differs, drag them into place as Google describes. The formulas and date window are ours; the page has no date-specific guidance.
| Order | Rule | Formula | Format |
|---|---|---|---|
| 1 | Done | =$A2="Yes" |
Gray text, strikethrough |
| 2 | Overdue | =AND($A2<>"Yes",$E2<>"",$E2<TODAY()) |
Red |
| 3 | Due soon | =AND($A2<>"Yes",$E2<>"",$E2>=TODAY(),$E2-TODAY()<=3) |
Amber |
Order matters. Google says rules are evaluated in the listed order and the first true rule defines the format. Ticking a box moves the row into Done, so it drops out of red and amber and a finished assignment stops flagging.
The three-day window is an example choice, not a recommended number. Change the 3 to whatever gives you enough warning.
Step 5: Make a Copy and Save a "Due This Week" View
Make a copy for your own use, then add a filter view for the week ahead. Click File, then Make a copy, name it, choose where to save it and click Ok. A filter view can then show the rows you choose, such as assignments due within a week.
Make a copy as Google describes it: open your sheet, click File, then Make a copy, type a name, choose where to save it and click Ok. This is our suggested way to make a named version for another person. Delete the example rows first if you want a clean start.
For the filter view, follow Google's filter view steps. Click Data, then Create filter view, sort and filter, then click Save View and Save. For "Due this week", filter Days left to 7 or less and set Done to exclude Yes. Both the numeric threshold and the filter condition are our suggestions; check the result in your own sheet.
Google says a view-only visitor can create a temporary filter view "that only you can use". It also lists letting multiple people find different filter views at the same time as one use. To rename a saved view, click its name next to Name at the top left, type a new name and press Enter. To open it later, click Data, then Change view. Use a second view named after one course for a "One course" slice.
![]()
What Keeps the Sheet in Use After the First Week
Four habits are our suggestions for keeping this sheet in use: add new dates there first, tick boxes when work is submitted, review amber rows once a week, and enter a new row for each repeated assignment. They describe a simple routine for this layout, not a finding about how students work.
Use the routine that fits your week:
- One place only. Type a new date into the sheet before anywhere else.
- Tick on submit. Tick the box when the work is handed in, not when the writing is done. It pairs with the Submitted status.
- Sort by Days left once a week. Read the amber rows first.
- Type repeating work by hand. A weekly quiz or a Friday reading log needs a new row each time in this layout. A tracker with a recurring tasks tab and weekly-to-yearly frequencies may suit repeated tasks better.
If you want alerts without opening the file, choose a tool that offers them, such as a calendar or school portal.
Where the All-in-One Task Tracker Fits
The All-in-One Task Tracker fits when assignments are only part of the list. It is one Excel and Google Sheets file with 11 tabs, so a student with a job, chores or repeating work can keep tasks, calendars, a priority matrix and a timeline on the same rows. A student with only coursework does not need it.
About us: Cosmo Suite makes the All-in-One Task Tracker, which we sell. This editorial guide was fact-checked against Google's official Help pages on Nov 17, 2026. Contact our team with a correction. A plain assignment sheet is one list. When tasks include more than coursework, a calendar, priority view and timeline may help. The tracker has Variable Tasks and Recurring Tasks tabs, where recurring tasks repeat from weekly to yearly, plus Monthly and Weekly Calendars, a Task Filter with 15+ options, a Decision Matrix (Do, Decide, Delegate, Delete), a Kanban Board and a Gantt Chart. It can track up to 10,000 tasks and comes with a step-by-step PDF and a YouTube tutorial.
Our Excel walk-through shows the same ideas in Excel, and the task list template is the simpler single list. For one student's term, this simple sheet may be enough.
Frequently asked questions
What columns should a Google Sheets assignment tracker have?
It depends on the list. A simple version can use Assignment, Due date and Done. Add Course, Type, Days left, Status, Priority and Notes when they help you sort or filter a longer list. The nine-column version in this post is one layout, not a rule. Start with the fields you will update.
How do I highlight assignments that are due soon in Google Sheets?
Select the rows, open Format, then Conditional formatting, and choose Custom formula is. Enter a formula that compares the due date with TODAY(), and put a dollar sign before the column letter so each row reads its own cells. The three-day window in this post is an example, so change it to suit you.
How do I add a checkbox to a row in Google Sheets?
Select the cells, click Insert, then Checkbox. To use your own words instead, open Data, then Data validation, choose Checkbox as the criteria, click Use custom cell values and enter what a ticked and an unticked box should hold, such as Yes and No. Click Save to apply it.
How do I give a classmate or my child their own copy of a Google Sheet?
Make a copy of the sheet. Open it, click File, then Make a copy, type a name, choose where to save it and click Ok. Name the copy for the person who will use it, then remove the example rows if it should start empty.
Can a parent and a student use the same assignment tracker?
Yes. Use one sheet together, or make a copy for each person. Google says a view-only visitor can create a temporary filter view that only they can use. It also lists letting several people find different filter views at the same time as a use of the feature. Check the file's sharing settings for the access you want.
When is a spreadsheet not enough for assignments?
A manually maintained list may not fit when dates need to come from a school portal automatically or a group needs to assign work to one another. A portal or group task app may suit those needs better. For repeating tasks beside coursework, the All-in-One Task Tracker has a Recurring Tasks tab with frequencies from weekly to yearly.
Sources
- Google Docs Editors Help: Add & use checkboxes
- Google Docs Editors Help: Use conditional formatting rules in Google Sheets
- Google Docs Editors Help: Sort & filter your data
- Google Docs Editors Help: Create an in-cell dropdown list
- Google Docs Editors Help: Create, view, or download a file (File > Make a copy)